PROCESS PRIORITIES
Protect the result before selecting the consumable.
- Controlled removal on a very hard substrate
- Scratch and subsurface-damage reduction
- Stable consumable life

SiC

PROCESS PRIORITIES
ENGINEERING ROUTE
FIRST REVIEW INPUTS
APPLICATION MATCHING
PROCESS DEVELOPMENT
APPLICATION REVIEW FAQ
Yes. Current defects, wear, removal data, used consumables and inspection evidence often make the constraints clearer than a blank specification.
Yes. Contact material, carrier or plate structure, abrasive, pH, liquid transport and cleaning are reviewed as one process interface.
Only after the drawing or selected specification, first-article measurement and application validation have been agreed. Public examples are guidance, not a universal guarantee.
APPLICATION REVIEW